1 / 1
Lignite Drying Project for Power Plant
- LocationMongolia
- Capacity1,100 TPD
- MaterialLignite
- Inlet & Outlet Moisture38%-16%
Project Background
High-moisture lignite is widely used for power generation, yet its inherent high moisture restricts combustion performance. This power plant faced low boiler efficiency, unstable combustion, high flue gas emission load and extra fuel consumption when directly burning raw lignite at 38% moisture. The client required a continuous drying system to stabilize fuel quality, cut operating costs and satisfy boiler feeding requirements, with target daily throughput of 1100 tons dried lignite and final moisture controlled at 17%.
Drying Solution
We adopt a special lignite rotary drying system matched with anti-spontaneous combustion and temperature control design. The whole line includes feeding, crushing, rotary drying, dust collection and finished product conveying. By optimizing hot air distribution and residence time, the system steadily reduces lignite moisture from 38% to 17%. Online moisture monitoring and temperature interlock protection are configured to avoid overheating and lignite spontaneous combustion, ensuring stable continuous operation under large load. Closed dust removal system meets environmental standards.
Project Benefits
✅ Raise lignite calorific value and improve boiler combustion efficiency, reduce coal consumption
✅ Stabilize fuel quality, eliminate boiler flame fluctuation and operation risk
✅ Lower flue gas treatment load and reduce emission pressure
✅ Continuous large-capacity operation, low failure rate and easy maintenance
✅ Help the power plant achieve safe, economical and environmentally friendly lignite utilization