150 TPD Sludge Dewatering & Drying Project
- LocationJiangsu, China
- Capacity150 TPD
- MaterialSludge
- Inlet & Outlet MoistureFrom 80% to 15
In June 2024, Dongding Machinery commissioned an integrated sludge dewatering and drying line in Jiangsu, China.
Project Background
The client sought to reduce sludge volume and stabilize output for co-incineration and resource recovery.
Solution & Process
The line combines mechanical dewatering with a rotary drum dryer, maximising moisture removal while minimising energy use.
Dewatering machine for primary moisture removal
Rotary drum dryer for final drying
Hot-air furnace with waste-heat recovery
Complete odour and dust control
Results & Benefits
Sludge moisture falls from 80% to below 15%, greatly reducing volume and enabling safe, economical disposal.